Photo update March 2016
![](https://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/03-foundation.jpg)
Follow
X
Follow
![01 container lifted](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/01-container-lifted-300x168.jpg)
Settingthe containers in place
![02 pouring foundation](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/02-pouring-foundation.jpg)
Pouring the foundation for the temporary chapel
![03 foundation](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/03-foundation.jpg)
Looks like a construction site!
![04 temp roof beams](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/04-temp-roof-beams.jpg)
Foundation poured and roof beams in place
![05 roof in place](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/05-roof-in-place.jpg)
Roof and foundation done
![05a cement and roof done](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/05a-cement-and-roof-done.jpg)
It’s taking shape!
![06 Arturo at work](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/06-Arturo-at-work.jpg)
Arturo hard at work
![07 Ethel scraping floor](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/07-Ethel-scraping-floor.jpg)
Ethel scraping the floor
![08 Mateo scraping floor](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/08-Mateo-scraping-floor.jpg)
Mateo working with his mom (Ethel)
![09 preparing lunch](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/09-preparing-lunch.jpg)
Armando takes charge of lunch preparations!
![10 laying tile (2)](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/10-laying-tile-2-300x225.jpg)
Tile crew, all church members
![11 laying tile](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/11-laying-tile-300x225.jpg)
How’s it look?
![12 Ethel and Liisa](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/12-Ethel-and-Liisa-300x225.jpg)
Liisa and Ethel check on progress
![13 tile 3-4ths](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/13-tile-3-4ths-300x225.jpg)
About 75% done in one day.
![14 tile almost finished](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/14-tile-almost-finished-300x225.jpg)
Almost done laying tile!
![15 last tiles](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/15-last-tiles-300x225.jpg)
The last few pieces
![16 tile done](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/16-tile-done-300x225.jpg)
Tile and roof finished!
![17 painting roof beams](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/17-painting-roof-beams-225x300.jpg)
Fabricio paints the roof beams
![18 lunch time](http://globallutheranoutreach.com/blog/tino/wp-content/uploads/sites/12/2016/03/18-lunch-time-300x225.jpg)
Enjoying lunch!
Workers come in all sizes!
4 Responses to Photo update March 2016